83MW Solar Photovoltaic Power Plants
KZ536007
Пpoвepкa aктyaльнocти: 16.06.2025 08:36
Информация о предложении
KZ536007
Пpoвepкa aктyaльнocти: 16.06.2025 08:36
Прибыль (в месяц):
231 000 000 - 345 000 000 ₸
Вид:
Продажа готового бизнеса
Тип:
Посредник
Окупаемость (месяцев):
20
Кассовая прибыль / Сash Flow:
289 249 684 ₸
Описание бизнеса
Kazakhstan has been actively working to develop and expand its renewable energy sector. The country possesses significant potential for renewable energy sources, particularly wind and solar power, due to its vast land area and favourable climatic conditions. Covering an area of 2.724 million square kilometers, the country has the ninth largest territory in the world.
Kazakhstan has now established around 130 renewable energy facilities, and the country’s potential for green energy generation is huge. Kazakhstan has set an ambitious goal – to reach carbon neutrality by 2060.
As the largest Central Asian country, Kazakhstan, has a great potential of solar energy. Solar power has a great potential as a renewable energy resource due to sparsely populated large areas and the climatic conditions, especially in southern Kazakhstan with an annual sunshine of 2200 to 3000 hours. During the summer months (June – August), due to its geographical location, the southern part of Kazakhstan receives direct solar radiation for the most of the daylight hours which constitute 83 – 96% of the maximum possible value.
According to plans by the Ministry of Energy of Kazakhstan, in the region RES projects with a total capacity of 2,615 MW will be implemented until 2025 . In 2021, the total installed capacity of RES in Kazakhstan amounted to 2,010 MW, of which 49 were solar power plants.
Overview
The project aims to construct, operate and maintain a 83 MW photovoltaic power generation plant in Turkestan Region, in the South of Kazakhstan. The power plant will use poly-crystalline photovoltaic modules and occupy a 83.20-hectare site. It will be connected to the KEGOC grid by underground transmission lines linked to an existing MV/HV transformer situated nearby from the site.
The project involves the construction of a cable duct to connect the plant to the electricity transformation station for delivery to the National Energy Transmission Network. Along its entire length, the cable duct will be completely underground.
The connection of the plant will take place via a 220kV antenna on the new 220kV transformation station which will be interconnected to the NTG (National Transmission Grid) by means of an aerial connection to the electrical substation, located approximately 1.5 km away.
Keypoints
Status: Pending – Ready to Build (Diagram Distribution Power under review)
Denomination: Turkestan I, Kazakhstan
Number of Panels: 132,000
Power MWp: 83,160
Area: 130 Ha approx
Number of Strings: 6,000
Number of panels: 132,000
Rated installed power: 83,20MW
Number of inverters: W 24
Inverters typology: SMA Sunny Central 2.060-EV
DC to AC ratio: 1500V 1.13
Technical Data
The Connection User system (IUC) will consist of:
− A 30/220 kV electrical transformation station which conveys the energy produced by the plant through 30 kV connections and carries out the transformation at the nominal voltage of 220 kV with 2 transformer uprights equipped with TR 30/220 kV of 45 MVA ;
− A delivery stall at the exit of the 220kV line, for the interconnection in AAT cable towards the electrical station of the NTG, of the transformation station of the planned plant;
− AAT connection in overhead (or, if necessary, underground) cable duct at 220 kV between the new transformer station and the NTG (section of connection – SE in the project).
Electromechanical Connection
The station will be built in a “single busbar” configuration (three conductors) at 220 kV, with air insulation. The 220kV busbar system will be characterized as shown below.
N° 2 stalls available for future expansion;
N° 2 TR stalls for the transformation of the energy produced by the photovoltaic system;
No. 1 delivery stall.
Width of the “HV/MV transformer” type stalls: 14 m;
Distance between phases for busbars, equipment and conductors: 3.20 m;
Bus axis height: 9.30 m;
Height of stall conductors: 5.30 m;
Nominal Data
Rated voltage: 220kV
Maximum voltage: 245kV
Insulation level at ia: 1050 kV (to earth)
Insulation level at fi: 460 kV (to earth)
Rated Frequency: 50Hz
Cable Output Stall Current Rating: 2000A
Transformer Stall Current Rating: 2000A
Busbar rated current: 3150 A
Rated voltage volumetric circuits: 100 V
Rated current of current circuits: 5A
DC Auxiliary Supply Voltage: 110V
AC Auxiliary Supply Voltage: 230/400V
The post 83MW Solar Photovoltaic Power Plants appeared first on MergersCorp M&A International.
Гeoгpaфия и мecтoпoлoжeниe

Город:
Условия сделки
Цена:
5 355 406 686 ₸
Финансовая информация
Среднемесячные показатели:
Кассовая прибыль / Сash Flow:
289 249 684 ₸
Коэффициенты:
Цена/Прибыль (окупаемость в годах):
1.7x
Корпоративные вопросы
Подтверждаемость показателей:
Готовый бизнес по схожей цене
-
Сеть автовокзалов
Прибыль (в месяц): 255 000 000 - 380 000 000 ₸Окупаемость (месяцев): 185 817 656 812 ₸ -
Птицефабрика
Прибыль (в месяц): 218 000 000 - 325 000 000 ₸Окупаемость (месяцев): 185 000 000 000 ₸ -
Subsoil Use Rights for Aktobe Oilfield Redevelopment (1.5M Tons B+C1)
Прибыль (в месяц): 215 000 000 - 325 000 000 ₸Окупаемость (месяцев): 184 933 585 155 ₸ -
Мукомольный комплекс
Прибыль (в месяц): 213 000 000 - 320 000 000 ₸Окупаемость (месяцев): 184 933 585 155 ₸ -
Салон Красоты.
Прибыль (в месяц): 245 000 000 - 365 000 000 ₸Окупаемость (месяцев): 215 898 885 502 ₸ -
Газораспределительная организация.Реализация Газа.
Прибыль (в месяц): 255 000 000 - 380 000 000 ₸Окупаемость (месяцев): 205 805 000 000 ₸