33MW 4x HPP Hydro Power Plant
KZ575531
Пpoвepкa aктyaльнocти: 16.06.2025 08:36
Информация о предложении
KZ575531
Пpoвepкa aктyaльнocти: 16.06.2025 08:36
Прибыль (в месяц):
265 000 000 - 400 000 000 ₸
Вид:
Продажа готового бизнеса
Тип:
Посредник
Окупаемость (месяцев):
20
Кассовая прибыль / Сash Flow:
333 083 601 ₸
Описание бизнеса
Kazakhstan has abundant hydro resources, which are mainly concentrated in the eastern and southern parts of the country. Today, 15 large hydropower stations (>50 MW) with a total capacity of 2.25 GW account for up to 13 per cent of the country’s total generating capacity.
Kazakhstan positions itself as a promising country for the development and implementation of hydropower projects on its territory. The state sets an ambitious plan of achieving the 50% share of electricity production in the country using renewable energy sources by 2050 (hereinafter – the “RES”).
Hydro energy resources are distributed throughout the country, but three areas have particularly large resources: the Irtysh River basin and its main tributaries (Bukhtarma, Uba, Ulba, Kurchum, Kardzhil), the southeast zone with the Ili river basin, and the south zone with the Syrdarya, Talas and Chu river basins.
Overview
The purpose of the Project is the construction of 4x cascade of small HPPs with a total capacity of 33.00 MW
The project has a local and regional scope. The project is intended to cover the basic part of the electrical load schedules of the Almaty power center, Almaty region of the Republic of Kazakhstan. The cascade on the River consists of 4x small hydropower plants. Each HPP of the cascade is a combination of hydraulic structures and technological equipment, convert the gravitational energy of water into mechanical energy of the flow and then into electrical energy, which is subsequently delivered to consumers.
Keypoints
Status: Ready to Build
Project Objectives: Construction of a cascade of small HPPs in the Almaty region for: a source of environmentally friendly electricity for supply to consumers in the Almaty region; increasing the reliability of the energy system of the region. – reducing the shortage of electricity in the Almaty region.
Installed capacity: 33 MW (Estimated)
Electricity generation: 140 GW / Year (Estimated)
Electricity tariff with VAT/without VAT: 41,23 Tenge per kWh (0,093 USD / kW)
Technology: Hydro units with radial-axial turbines (2x Turbine “Ossberger” for 4 HPPs)
The post 33MW 4x HPP Hydro Power Plant appeared first on MergersCorp M&A International.
Гeoгpaфия и мecтoпoлoжeниe

Город:
Условия сделки
Цена:
6 166 981 444 ₸
Финансовая информация
Среднемесячные показатели:
Кассовая прибыль / Сash Flow:
333 083 601 ₸
Коэффициенты:
Цена/Прибыль (окупаемость в годах):
1.7x
Корпоративные вопросы
Подтверждаемость показателей:
Готовый бизнес по схожей цене
-
Свиноводческий комплекс
Прибыль (в месяц): 260 000 000 - 385 000 000 ₸Окупаемость (месяцев): 205 920 302 186 ₸ -
Газораспределительная организация.Реализация Газа.
Прибыль (в месяц): 255 000 000 - 380 000 000 ₸Окупаемость (месяцев): 205 805 000 000 ₸ -
Действующая производственная промбаза
Прибыль (в месяц): 255 000 000 - 385 000 000 ₸Окупаемость (месяцев): 195 900 000 000 ₸ -
33MW 4x HPP Hydro Power Plant
6 166 981 444 ₸ -
Угольный карьер
Прибыль (в месяц): 255 000 000 - 385 000 000 ₸Окупаемость (месяцев): 195 920 302 186 ₸ -
Готовый ритуальный бизнес
Прибыль (в месяц): 270 000 000 - 405 000 000 ₸Окупаемость (месяцев): 206 169 643 024 ₸ -
Салон Красоты.
Прибыль (в месяц): 245 000 000 - 365 000 000 ₸Окупаемость (месяцев): 215 898 885 502 ₸ -
Сеть автовокзалов
Прибыль (в месяц): 255 000 000 - 380 000 000 ₸Окупаемость (месяцев): 185 817 656 812 ₸